3500 TON Chilled AND HOT WATER PLANT WITH NATURAL GAS FIRED CHILLER AND HEAT RECOVERY FROM THE ENGINE AND PLANT POWER GENERATOR.
cLEARWATER, Florida
Chilled water system study Then the chiller replacement and chilled water system upgrade
St. Petersburg, Florida
Phase I -2400 ton Chiller Plant
Phase II - Additional cooling tower, secondary pump
Sarasota, Florida
Chiller No. 6, repiping
Tampa, Florida
Chiller addition
Tampa, Florida
Chiller plant and cooling tower replacement
Wauchula, Florida
Ammonia chiller replacement studY
Tampa, Florida
Chiller replacement
Oldsmar, Florida
Chilled water system modifications
and chiller replacement
St. Petersburg, Florida
Chiller plant, boiler plant, and hot water loops
Lakeland, Florida
Essilor
Dept. 110, Rooftop unit and chiller replacement
St. Petersburg, Florida
GTE
Florida, Inc.
Chiller study and replacement of four existing chiller and cooling towers with one 350-ton chiller, one 220-ton chiller, new stainless steel cooling towers and a primary/secondary pumping system, Clearwater Main
Clearwater, Florida
Replacement of 583-ton centrifugal chiller and 1500 tons of cooling towers, Twigg Street
Tampa, Florida
Suncoast Schools Federal Credit
Union
Chiller replacement
Tampa, Florida
Tampa
Electric Company
Chiller replacement and cooling tower addition, Big Bend Unit #4
Tampa, Florida
AMI Palmetto Hospital
New Energy Center, including new chiller plant, boilers, and cooling towers
Hialeah, Florida
(3) 160 ton chillers, (1) 40 ton heat recovery unit and associated controls, pumping and piping package
Tampa, Florida
Chiller addition, (2) 80 ton chillers
Tampa, Florida
Addition of (2) 500 ton chillers, cooling tower, and associated pumps for primary/secondary function. implemented as part as an energy savings contract
pinellas Park, Florida
addition of chiller, cooling tower and air handling units. implemented conversion to primary/secondary chilled water system.
tampa, Florida
addition of (2) 120 ton chillers
Tampa, Florida
(2) 25 ton process water chillers
hemosillo, Mexico
Addition of (1) 25 ton process water chillers
Tampa, Florida
central Plant improvements to include addtional chillers, cooling towers, and pumping package to facilitate development growth
clearwater,
Florida